Nearly two years after the Alliance for Nuclear Responsibility (A4NR) filed to oppose PG&E's
premature request for license renewal funding for its Diablo Canyon nuclear plant, the California
Public Utilities Commission (CPUC) has ruled, granting the Alliance's motion to dismiss the
application. The case hinged on the need for PG&E to complete the advanced seismic studies
recommended by the California Energy Commission (CEC) under AB 1632 (Blakeslee-SLO).
"PG&E has known all along what our state expected them to do, and has flaunted those orders,
wasting time and money in the process," adds Rochelle Becker, A4NR's executive director, who
is pleased with the ruling. "We'd already know by now whether the seismic footing at the Diablo
Canyon site was secure. Instead, it took the unavoidable public scrutiny that arose after PG&E's San Bruno explosion and the Fukushima meltdowns to shed light on their inaction."
Throughout the proceedings, A4NR built its case on the failed history of the CPUC in exerting
proper regulatory oversight in seismic matters at California's nuclear reactors. Notes A4NR
outreach coordinator David Weisman, "When the CPUC granted PG&E their original funding
permit in 1967, nobody checked or verified the seismic assertions made by PG&E or the Nuclear
Regulatory Commission (NRC), and as a result, ratepayers later forked over billions of dollars
for costly seismic retrofit blunders at the reactors. We can't afford that again."
At one point in the multi-year proceeding, The Utility Reform Network (TURN) and the
Division of Ratepayer Advocates (DRA) at the CPUC proposed a settlement agreement, which
would have reduced slightly the dollar amount requested by PG&E. A4NR protested the
settlement. "What good is it to save the ratepayers $5 million on the relicensing cost if it removes
the need for PG& to complete the seismic studies? In the wake of Fukushima and our nearly
bankrupt state budget, relying on nuclear energy for another 20 years without a full knowledge of
the seismic risks is a sure path to economic catastrophe."
PG&E had countered with a request to simply "suspend" the proceeding indefinitely, but the
administrative law judge disagreed, stating, "With a final seismic studies report expected in
December 2015, there is no reason to keep this proceeding open. PG&E would have us suspend
this proceeding until it completes its advanced seismic studies, but offers no substantial reason to
suspend rather than close this proceeding."
A4NR's Becker concludes, "This step by Judge
Barnett shows consumers that the CPUC is making strides to protect ratepayers in post-San
Bruno, post-Fukushima world. We can now focus on making sure the seismic studies are well
designed and independently peer reviewed at every step of the way."